Thursday, July 24, 2008

July 18-20 projects

Project one for this weekend was to create the half wall between the formal entry and the living room to open the space. The light switch was moved lower on the wall, an outlet was added to the exterior from this circuit, a box was put in for the outside light (was just atatched to the house before) and the wiring cleaned up a little.



We are a little concerned about the stability of the new half wall and so we plan to add a post to the open end at some point in the future.

Project two was to install the can lights throughout the house for better lighting as well as new switches and smoke detectors.

Here Ben is cutting the holes for the two 4" can lights that go above the kitchen sink

This is one of the can lights in the living room. We have not put the covers on yet as we still plan to paint the ceiling.

My brother finished my demolition project in the basement by removing all of the drywall ceiling and between Ron and Ben all of the tackstrip is finally up as well as the staples that were still in the two larger bedrooms.

While the guys worked on the electric, mom and I removed all of the doors, drawers, and hardware from the kitchen so it can be prepped for paint later.


I also primed the chair rail for Tylers bedroom and went to Lowes for new hardware for the kitchen cabinets, a shower can light cover, paint and some misc electrical parts we needed.

By the end of the weekend the lighting in the house was great. We are especially pleased with the lights in the hallway because it went from a dark tunnel to a bright and inviting space.

There are still some unfinished things to do as far as electric but it will now wait until after the roofing is done this weekend.

Wednesday, July 16, 2008

The Shock of Electric Costs


A trip to Lowes last night for electrical supplies caused Ben and I to re-evaluate the number of recessed lighting we want. I wouldn't budge on the light for the shower (a girl has to be able to see her legs to shave right)







As you can see the supplies are stacking up......now lets get on with the work.

Tuesday, July 15, 2008

The other jobs tackled since purchase



No not that kind of tackle Tyler!


We have been able to tackle quite a few things around the house in addition to the carpet removal and suppply purchasing I blogged previously.


  • Ben was also able to clean out the gutters in preperation for roofing.
  • Ben arranged for a dumpster to be delivered prior to roofing and started calling around to find helpers and equipment like shovels and nail guns.
  • We cleaned up the tree branches that were down in the yard. I started scraping that black backing off the kitchen/dinning room floor and let me tell you that is hard work.
  • I removed all nails and screws from the walls and spackled them to prep for paint.
  • I removed all the tack board in the living room, hallway and Tylers bedroom as well as all of the staples that held down the carpet pads and vacumed.
  • I started ripping out all the moldy paneling and foam board in the basement.
  • Ben supervised and helped with the delivery from Lowes.
  • We stocked the bathrooms with TP soap and paper towel for the work days ahead.
  • Mom and dad delivered an apartment sized refrigerator I had picked up for free to use while we work and I had to clean it.
  • We laid out a plan for the electric and made a material list
  • Finally, we made plans to create a half wall in the living room where the wall currently separates it from the entry.

The big trip to Lowes

So Ben and Dad did some final measurments to make a material list for the roof.





Then Ben and I went to Lowes and bought all the roofing, new locks, our flooring, primer etc. They were so helpful and gave us 10% off our first purchase and delivered everything for only $30.00.


Goodbye nasty Carpet!

The work on the house started with some demo. That nasty, smelly carpet had to come out. Tyler enjoyed helping us rip it out and I was so happy to see that kitchen carpet come up. Unfortunatly the backing stayed glued in place and now we have to scrape that off.









Thursday, July 10, 2008

SOLD!!!!

We finally closed 2 months after putting in an offer. We are so relieved to have that part over. Now on to the renovations to make our house a home.




:)




Wednesday, July 9, 2008

Trees Down

So we lost a few trees in the last storm. Luckily none of them fell on the house. We will be cutting them up to use for bon fires later. Also, some water came in the basement but it was such a bad storm that I heard that a lot of people had problems with their basements.

Closing was supposed to be Tuesday July 8 or we would loose the house and then Tuesday morning the seller told us they were not ready and now we close Thursday July 10.

Please Lord let this part be over. We need to get so much done on this house and we have lost so much time.